Only a little update today, the garage lintel is up (although the temporary frame behind is still there - at least for now) and the bricks are done. There also looks to be some material for cladding the eaves stacked in the garage.



A bunch of coloured pegs have been put in the block on the "low side" of ours although I'm not sure what they're for - they may just be to indicate where the pipes run below (some of this area is an easement) but I'm not sure. They run all the way down the side boundary of that block too. I guess time will tell.



It looks like the brickies have moved their guide sticks to the back wall of the ensuite/walk in robe so soon the bricks will be making an appearance on the "high" side of the building.