Friday, March 4, 2016

Our House Blog - New Renders

So I started drawing the house again from scratch using the dimensions from the builder's plan.

This is the laundry (colours/finishes still to be confirmed!)



I've done the lights using the electrical plan layout too, although I'm still getting the hang of using Twilight's lights so it may not be quite right, I also need to get some 3D batten and downlight/pendant models to put in the same place as the lights themselves too.

Below is the theatre room, note I've not drawn any doors or cavities yet, although I've done the correct sized cornice and skirting boards/architraves.


It's amazing how much difference the architraves/skirting makes, here's a shot with just the cornice (although not on the bulkhead above the kitchen cabinets):



And the same with the architraves and skirting - I haven't put any windows in the model yet which is actually making it render much faster so I'll keep working this way for a while! Again the colours and finishes aren't yet confirmed, but this will allow us to play with them to work out where we want/need to be when it comes to that.


Entryway timber screen, this hasn't been drawn with any dimensions etc by the builder yet so I'm trying to nut out what height it needs to be at etc - I've matched it to the kitchen benchtops for now.



Looking from the garage/entry point we will typically use, towards the living room.



This is using the site survey ground heights at the corners; I haven't done contour lines as the cut and fill will mean very little natural ground level will remain, hence I've rendered with a rock/dirt texture the backfill areas:

Wednesday, March 2, 2016

Our House Build - mFLOR render


mFLOR have a collection of high resolution rendering textures, so I used one with my existing drawing (and copious amounts of downlights) to see how it changes the space. I have the builders plans with dimensions now so I can re-draw for a more accurate render; which I've already started doing.

This is their mFLOR Argyll Fir - Glenmuir finish/colour.

Our House Build - Builder Visit Debrief

Wow. Plenty to take in tonight! I should mention how great it is that our builder is flexible enough to meet us at 5.45pm and hang around as long as it takes. Sarah and I both work in sales roles ourselves and can't easily co-ordinate time off during the day so this is super helpful in allowing us both to be there!

First surprise - our block has 3.35m of fall across the front. Umm. There's proof I have no idea how high things are by looking at them, and that I can't assume the height indicated by contour lines... whoops! The builder has drawn the house 1.335m cut from the north boundary (although this doesn't conceal any windows as the block drops close to a meter to the rear or east boundary, and it is tallest at the ensuite which doesn't have any windows facing north).


  • This will mean I need a retaining wall around 12m long and approx 1.2m high at a very approximate $250/m2 or around $3600!! I'll need to get a few quotes/options there I think.


The next is our site is BAL12.5. Because we've chosen (so far, at least) Colorbond roofing, we're looking at $1780 to upgrade to BAL12.5. This is the only itemised cost listed, although I'm told the flyscreens are aluminium instead of fibreglass as well to resist ember attacks. Bugger.

Gas central heating is costed around $3,000 and if we want to add a single split system its just under $3,500. I think given what I've worked on we will probably do inverter central heat and air instead as it's a pretty marginal difference. It's probably best to do this directly with the business rather than through the builder. My mortgage broker tells me we should be ok for up to 20% of the total build to be done via suppliers other than the builder; but that it's easier to use the builder where possible.

Some other itemised "extra" costs:


  • Supply and fit basic ceiling fans in place of normal batten fix lighting - $792 for 6
  • Hot water continuous loop - gas boosted solar instant system - $937.20
  • NBN connection $720 (FTTH, this will beat the hell out of 5Kbps DSL2 sync we currently hit)
  • Smart Stone benchtops - $4,293.85 


Good surprises:

  • Brick upgrade to Mocha from standard inclusion - $888.62
  • External gas connection for BBQ - $198
  • Window upgrade to Scarlett's room shouldn't cost anything as the bricks cost and window cost should cancel each other out.
  • Most of the tiles we like are in the inclusion level we've been quoted.
  • The builder will provide the screen in the entry way at no cost - from hardwood 32mm vertical beams, stained.
  • Driveway crossover will be included in site costs
  • This price includes the butlers pantry


Things for me to remember:

  • Carpet inclusion - we probably need to step up one level to get a carpet finish Sarah likes; alternatively price external suppliers.
  • There's no costings done for render. This isn't overly necessary as we can always add that later if we dislike a complete brick facade. The builder would prefer to use the same brick all round for logistics so we don't save any brick cost by going a cheaper brick to render over.
  • The wider panels of sliding door don't have flyscreen as they can't make a fixed one in the size we want. We can always retrofit the A&L retractable units for around $1000 a door later.
  • Sarah wants/needs a door on the shower screen in the ensuite - the current drawings don't show this and it'll cost a bit more - the current side screens will likely need to run to the roof to limit flex.


Once I add the shed costs, we're about $36,000 over our original pre-approval amount. Add the estimated cost of the retaining wall and we probably need to ask for another $40,000. Good thing we've continued saving so should have enough deposit to cover that by the time we get to that point in the process.

There are still some other factors to consider;

  • We haven't allowed for any fencing, I probably should organise some quotes to at least have an idea for that. We've got neighboring owners (although no building works yet) on our north and east sides, and one of the two blocks that back onto our south boundary looks to have been sold; so at least we're likely to only have to worry about half the cost of the fences.
  • We haven't allowed for landscaping. That can wait. Grass seed will have to do for a while; unless people want to bring us a few m2 of turf each as a house warming gift!
  • The garage floor had only been dropped about 100mm. I've insisted that even if it costs a little more (there will be a few more brick courses at the bottom, we need to drop it by 300mm to allow close to 2400mm door openings; for drive-through to the backyard shed. This will also level the driveway out a little; the fill at this end of the block  is between 1 and 1.6m from one side of the shed to the other, so dropping the floor height for the shed by 200mm means for a relatively gentle slope, especially on the side that goes through to the back yard (13% to 23% from one side to the other)
The most upsetting news is that over the top of everything above, we're looking around $10,000 to do polished concrete. The default quote is for vinyl plank flooring (mFLOR is the product the builder uses and recommends). Despite the fact polished concrete on its own would add around $4500 to the standard inclusion we've got to accept that the builder needs to allow for other factors such as harder concrete (spec from concrete polishers is 32MPA, builder would prefer to use at least 40MPA, but they have to do this for the entire slab pour, it's harder to work because there is less water added and an elasticiser) and then protect the surface, avoid nailing supports to the slab and just generally work other trades around the floor surface, so the extra cost is

Initially my thoughts were why not go to a large format tile; however that's an increase of $2,000 over where we're at for our floor area, plus Sarah hates the idea of trying to keep the grout clean. I am not super keen on timber floating floors because they're noisy,  and thankfully the vinyl floors aren't like that (we've seen a few in display homes). My first concern for our application was thermal resistance.

A study of the website states they're compatible with under-floor heating - viola - 0.010m2K/W-0.013m2K/W (or R-value) depending on the product thickness. Compare this with ceramic tiles at approx 0.012m2K/W or natural stone tiles at 0.017m2K/W and the vinyl planks (at least in thin form) are actually still a good option. (For passive solar, you want heat to freely transfer between the sun and your thermal mass, then back from the thermal mass to the room - in our case the thermal mass is the slab)

At this point I think the vinyl floor is the way we will go- I think we'll need to go with a dark, fairly neutral colour to leave our options open for wall colours and to ensure good heat absorption from the winter northern sun exposure.




Tuesday, March 1, 2016

Our House Build - Shed Slab

First quote for the shed slab came back, $1500 over the estimate from the shed people.

Not surprising given the slope of the block though, and the quote also includes thickening in the center for a hoist.

Here's the current costs for the shed:

Item Cost
Shed Kit $12,130.00
Variation – 5.1m w roller door $385.00
100mm slab, f72 mesh, 12of 300x300x300 footings, 15x7m $8,525.00
Building Erection $3,600.00
Power to shed/sub board $1,750.00



$26,390.00

I should point out this includes only a single GPO and a light. Other power and lighting will have to be added later.

We could build it ourselves, but then we need to register as an owner builder, apply for a building permit for the shed separately, and if we sell within I believe 7 years we have to warrant the construction of the shed up to 7 years from when it went up.

Tuesday, February 23, 2016

Sketchup - Playing Around (Not My House)

A member of the homeone forum commented on a thread I made for a build there regarding sketchup. I had a look at their thread, spotted their floor plan drawings and decided I'd have a go at drawing up their house. Some of the dimensions I had to guess and the roof is a little bit off what it should be, but it was good for a bit of multi-level practice :)



The house is coloured here in Dulux Tranquil Retreat, below is in Dulux Miller Mood



Below, is Dulux Dieskau:



Then back to Tranquil Retreat again, since that's what I exported all the other angles in.




















Sunday, February 21, 2016

Our House Build - More 3D Renders

I've been playing with Twilight Render which is a free-to-hobbyists renderer for sketchup - at first I wasn't a fan but it's actually quite powerful once you get used to how it works. It definitely takes its time to render but that could also be my computer showing it's age!



I still haven't quite worked out lighting (which is why even though I've added about 20 downlights, this image still looks dark-ish) but I've got the bump mapping for the grass, reflectivity for the concrete etc nailed. I've also made some exceptionally dodgy looking pendant lights for the sake of testing the render. Since we have no idea what we actually want to put here we will work on that for the future!

Prior to this, I geo-located the site in sketchup and rotated the model to close to the right orientation (it's off slightly as we're facing just over 5 degrees to the east as the house is aligned with the front boundary and it doesn't quite run a perfect north-south (see the surveyor's drawing with angles on this page)

This allows us to do a pretty good approximation of shadows in both the longest part of the year (summer solstice):




As well as the shortest part of the year (winter solstice):





For those that don't know, the reason North Facing living areas are so important is that with correct shading, you can get free heat from the sun in winter by letting the sun onto an appropriate thermal mass (in our case, exposed polished concrete) which then radiates the heat during the evening. Having the correct size eaves to shade the floor from this sun allows the heat to be kept out during the hotter parts of the year.

My initial modelling suggested a 600mm eave would be required, however 450mm has been the recommendation from the builder as apparently that's the width of the board they use; to do it in 600mm would have meant battening it out every 450mm and cutting the boards into 600mm length; and to do the whole house just to shade two north facing windows seemed a little crazy.

I spotted a homeone forum member's post where they had aluminium blades above their window, fixed at an angle that permitted winter sun but that blocked summer sun. I think we'll see how we go with the 450mm eaves and watch the sun on the floors in the summer (perhaps utilising time lapse on the go pro) before we commit to having something similar made, but that's definitely an option.

Friday, February 19, 2016

Our House Build - Visualising The View

Decided I wanted to try and get an idea of what the view will be like from the kitchen window - especially if a normal height fence will cover the Wannon Water hatchery shed but not the treeline at the river. All of the grassed area near the treeline is flood plain so should stay grassed for the foreseeable future.



First I went to the block and stood in approximately the location the window for the kitchen will be, and aimed directly south and at the horizon, then I put it in sketchup as a texture on a very large rectangle, centered on the middle of the window and about 50m away.

This allows the view to move with the viewpoint, with any luck it's close to accurate - the fence is drawn at 1600mm on this side and 2000mm on the north and east side (to limit neighbours being able to look down into our yard)



Applied the laminate Honey Elm texture to the benchtops and swapped the waterfall end. Sarah's not sure she wants a waterfall end at all now; although this does look more logical from most areas. Also removed the monument feature wall - walls are now Dulux Dieskau and ceilings Dulux Vivid White.



Played with the settings on Indigo and managed to make it a bit lighter, and higher resolution. It's still pretty noisy in the dark but I think it's emulating camera noise for some reason?



Gives a bit of an idea of what we should see anyway. Added a fridge in this shot to show the space a bit closer to how it will be used. Yes, I know I've not put a sink in yet!